From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:49 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Mark ODonnell 

Last updated:  08/11/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Pensacola, FL  32526
US

Mobile: 8502123231   
markodonnell2005@hotmail.com
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Mark ODonnell - Production Ops Supervisor

Resume Value: zdnbzyc65uffmfew   

  

 

Mark O’Donnell

7120 Princess Ln, Pensacola, FL, 32526 850-212-3231   markodonnell2005@hotmail.com

Objective

I am looking for a challenging position with a company that will give me the opportunity to grow, which also utilizes my education, supervisory skills, and experience. I am willing to relocate and travel as needed.

Education

Florida State University Tallahassee, FL

Bachelor of Science in Mechanical Engineering May 2005

Experience

BAE Systems Southeast Shipyards, Mobile, AL June 2011 to Present

1.      Supervisor Production Planning Operations- Outfitting

·         Currently assigned to the newly organized new construction Organization of BAE Mobile

·         Supervise multiple employees in the planning and scheduling of outfitting work on the different vessels

·         Develop Standard operating procedures

·         Work with program management and production to develop structural and outfitting build strategies

·         Create and analyze Earned Value Reports on a weekly basis

·         Detail planner/ scheduler for work packages, material requisition, material kitting, material takeoffs, and drawing reviews in new construction for structure, pipe, machinery, paint, electrical, carpentry, and structural outfitting

·         Progress and verify weekly work performed by craft

·         Schedule weekly new construction work utilizing Primavera P6

·         Create Manpower projections for new construction and repair projects utilizing Primavera P6 and Microsoft Project

·         Create bid schedules for ship repair jobs utilizing Microsoft Project

·         Develop detailed budgeted estimates for new construction

·         Develop craft rates based on work type, stage, and difficulty

·         Calculate capacity thru put and capabilities for new construction

·         Create and maintain integrated master schedule for new construction projects utilizing Primavera P6

 

Tampa Ship LLC/ Tampa Bay Shipbuilding & Repair December 2007 to June 2011

1.      Burn Table  Supervisor April 2010-June 2011

·         Coordinate incoming bulk material for the NC table per construction need utilizing Microsoft Project

·         Schedule parts to be cut on the burn table per yard and construction schedules

·         Operate ESAB Avenger 2 NC table and overhead cranes as necessary

·         Supervise a crew ranging from 6 to 10 people

·         Implemented process improvements to improve thru put and productivity of the burn tables

2.      Steel Foreman December 2008- April 2010

·         Supervise a crew ranging from 25 to 40 people

·         Handle schedule and work hours on certain projects

·         Create and follow a schedule based on production end dates utilizing Microsoft Project and Primavera

·         Enforce safety regulations and create good work habits

·         Monitor construction on various projects daily

·         Solved production problems as they occurred

·         Work off of blue prints and schematics

·         Instruct night shift on work over various different projects

3.      Panel Line Supervisor May 2008- December 2008

·         Supervise the all work going on in the panel line

·         Handled scheduling utilizing Microsoft Project and Primavera

·         Monitored supervision within the panel line to assure proper manpower and budget requirements where met for each job

·         Utilized blue prints to assure proper material was inside the building for each job

·         Controlled the MSA process for both large and small panels

·         Worked with engineering to solve production problems as they occurred

·         Monitored and controlled the flow of the panels thru the line

·         Implemented process improvements to improve thru put and productivity in the shop

4.      Scheduler/ Planner December 2007- December 2008

·         Created a schedule for the construction of steel panels and assemblies within the panel line and small panel line, utilizing Microsoft Project and Primavera

·         Monitored and progressed the work within the panel lines on a daily basis

·         Set up man power requirements for production to meet schedule within the panel line

·         Allocated budgets for each individual job to meet overall construction requirements

·         Tracked material shipments and coordinated materials to be delivered to the yard and eventually the panel lines

·         Worked hand and hand with the shop foremen to assure proper production procedures and sequences were adhered to.

 

Computer Skills

     I have a working knowledge of Primavera P6, Cobra 4.7, Cobra 5.0, Microsoft Project, Microsoft Word, Excel, Power point, Pro-E, and MathCAD.



Experience

BACK TO TOP

 

Job Title

Company

Experience

Supervisor Production Planning Ops

BAE Systems Southeast Shipyards

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Years of relevant work experience:

2+ to 5 Years

Date of Availability:

Negotiable

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Operations Manager or Planner/Scheduler

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-FL-Pensacola/Panama City

Relocate:

Yes

Willingness to travel:

Up to 100%